​乐鱼,雄安新区孝义河河口湿地水质净化工程设计 宋凯宇1,章粟粲1,魏俊1,陈奋飞1,杨棠武2

发布时间:2023-11-16

焦点提醒:雄安新区孝义河河口湿地水质净化项目设想 宋凯宇1,章粟粲1,魏俊1,陈奋飞1,杨棠武2 中国给水排水2023年中国污水中国给水排水2023年城镇污泥处理处置技术与应用高级研讨会(第十四届)邀请函处理厂提标改造(污水处理提质增效)高级研讨会(第七届)邀请函暨征稿启事中国给水排水2023年中国污水处理厂中国给水排水2023年城镇污泥处理处置技术与应用高级研讨会(第十四届)邀请函提标改造(污水处理提质增效)高级研讨会(第七届)邀请函暨征稿启事

  • 首 页
  • 期刊引见
  • 编委会
  • 投稿须知
  • 文章查询
  • 学术会议
  • 告白合作
  • 刊行定阅
  • 在线留言
  • English上一篇下一篇PDF下载[1]宋凯宇,章粟粲,魏俊,等.雄安新区孝义河河口湿地水质净化项目设想[J].中国给水排水,2020,36(10):62-69.点击复制

    雄安新区孝义河河口湿地水质净化项目设想中国给水排水[ISSN:1000-4062/CN:12-1073/TU]卷:第36卷期数:2020年第10期页码:62-69栏目:出书日期:2020-05-17
    Title:
    Design of Water Purification Project of Xiaoyi River Estuary Wetland in Xiongan New Area
    作者:
    宋凯宇1,章粟粲1,魏俊1,陈奋飞1,杨棠武2
    要害词:
    font-size: 10pt;雄安新区" style="text-decoration-line: none; color: rgb(48, 89, 220);">">雄安新区;白洋淀;组合人工湿地
    Keywords:
    font-size: 10pt;Xiongan New Area&quot����APP; style="text-decoration-line: none; color: rgb(48, 89, 220);">">Xiongan New Areafont-size: 10pt;" style="text-decoration-line: none; color: rgb(48, 89, 220);">">;Baiyang Lake;combined constructed wetlands
    摘要:
    雄安新区孝义河是白洋淀八条入淀河道之一,为包管白洋淀水质,实行孝义河河口湿地水质净化项目,项目设想处置范围为20×104m3/d,采取“前置沉淀生态塘+潜流湿地+表流湿地+沉水动物塘”组合处置工艺,项目建成后将成为国内第二洪流平潜流湿地。按照设想规范和设想经验猜测,当湿地来水知足《地表水情况质量尺度》(GB 3838—2002)Ⅳ类尺度时,冬季TP去除率≥30%;当来水知足Ⅴ类尺度时,出水水质知足Ⅳ类尺度;当来水劣在Ⅴ类尺度时,冬季TP去除率≥30%,其他首要超标污染物去除率≥20%。项目总占地为1.98 km2,扶植本钱约2 150元/m3,处置本钱约0.098 元/m3。
    Abstract:
    XiaoyiRiver in Xiongan New Area is one of the eight rivers flowing into Baiyang Lake. In order to purify water in Xiaoyi River, the river estuary constructed wetland project was constructed, the treatment capacity of which was 20×104m3/d. The treatment process was combined by“pre-precipitation ecological pond + subsurface wetland + surface wetland + submerged plant pond ”, the project would become the second largest horizontal subsurface wetland in China. Prediction based on design specification and engineering experience, if the wetland inflow could meet the class Ⅳ standard of Environmental Quality Standards for Surface Water (GB 3838-2002), total phosphorus(TP) removal would be required not lower than 30% in winter; if the inflow could meet the class Ⅴ standard, the effluent should meet the class Ⅳ standard;if the inflow quality is worse than the class Ⅴ standard, TP removal should be above 30% in winter, and the other major over-standard pollutants removal ought to be more than 20%. The area of this project was 1.98 km2, the construction cost of this project was 2 150 yuan/m3, and the operation cost was 0.098 yuan/m3.
    • 14:42 已群发

      原创无锡市市政雨污水管道检测“四位一体”项目治理切磋 7 1 1 0
    • 今天 08:58 已群发

      部门地域农村污水管网沦为“安排”,“最初一米”不管了? 112 2 1
    • 礼拜六 12:00 已群发

      两位全国项目勘测设想巨匠称号被撤消 400 2 1
    • 礼拜五 16:43 已群发

      转动分流制排水系统中组合式初雨调蓄池的设想与优化 / 初雨污染怎样破?德国经常使用的早期雨水处置工艺装备领会一下 90 1 1

    推荐资讯

13253338363
  • ​重金属污水处理工艺-行业新闻-污水处理设备,一体化污水处理设备,工业废水处理,佰仕德

    QQ:微信二维码